4/4/18 I'm not sure why this is, but it causes apscheduler's jobs to be scheduled twice A quick print "loaded scheduler" right before schedstart () confirms this There are a couple ways around this, as mentioned in the linked answer The one I found that worked best is just to disable the reloader like so It means I have to reload my appThis way the time the job stared at (or was scheduled to start at) will be passed in as a job argument See documentation for define_metadata_argument use a plsql block as the job action, and in the block you can refer to predefined variables job_start and job_scheduled_start have the default value for these arguments defined to be null, and then in your stored procedure interpret11/5/16 主要讲述关于apscheduler in which case any extra keyword arguments to this method are passed on to the trigger ' s constructor # an instance of a trigger class 看见没有,源码中解释说,有date, ' 28 29 scheduler = BlockingScheduler() 30 scheduleradd_job(func=date_test, args=
Introduction To Apscheduler In Process Task Scheduler With By Ng Wai Foong Better Programming
Apscheduler add job function with arguments